ADU Company in Pedley — Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates

ADU Company in Pedley, CA

Kitchen remodeling in Pedley means working with a specific generation of homes: mid-century and 1960s through 1980s single-story ranches on large lots that have rarely seen a major update since they were built. The heat in the Jurupa Valley basin punishes old ventilation, cheap cabinet boxes, and unsealed building envelopes, so a Pedley kitchen job usually involves more than replacing doors. Cottage ADU Builders has served Pedley since 2012, and we approach every kitchen here as a structural, cooling, and livability project, not a cosmetic refresh. Call (866) 808-7312 to schedule a free estimate.

Call (866) 808-7312

Why Pedley Homes Are Different

Pedley is an unincorporated Jurupa Valley-area community in Riverside County, which changes how permits work. ADUs and kitchen remodels here run through Riverside County’s Building & Safety rather than a city building department, and the county’s rules are more permissive than most of the surrounding incorporated cities like Jurupa Valley, Eastvale, and Norco. That means a Pedley homeowner in 92509 can often build a larger detached unit or scope a remodel with more flexibility than a neighbor a few blocks away who falls under city jurisdiction.

The housing stock tells the same story. Pedley’s homes are mostly mid-century and 1960s to 1980s single-story ranch houses on flat, half-acre-plus lots with deep setbacks and big backyards. Those generous distances from property lines make detached ADUs and garage conversions far more feasible here than in the tighter tract subdivisions of Eastvale or Jurupa Valley.

Climate adds the third layer. Pedley sits in the hot, dry Jurupa Valley basin with intense Inland Empire summer heat and Santa Ana wind events. Any remodel or new build here needs serious insulation, shade, and high-efficiency cooling, plus materials that hold up to dust and wind-driven debris. We plan for that from the first site walk.

Our Main Pedley Services

Pedley homeowners most often call us about two things: adding a detached unit in the backyard, and updating a bathroom inside the main house. Both run through the same Riverside County permitting path, and both benefit from a contractor who already knows the local plan check process.

ADU Builders in Pedley

Pedley’s large lots and county-level zoning make it one of the more practical places in the Jurupa Valley area to add a detached ADU. We handle the full scope, from site prep and foundation through utility hookup and interior finish, and we work with the prefab and modular systems many Pedley homeowners are already researching. A lot in 92509 often clears the county’s setback and size limits more easily than a comparable parcel in an incorporated city. See how we approach these projects in Pedley: ADU Builders in Pedley.

ADU Builders in Pedley

Bathroom Remodeling in Pedley

Most Pedley bathrooms sit inside ranch homes built before modern ventilation and waterproofing standards. That means our typical remodel here addresses old exhaust fans, drywall that has absorbed decades of steam, and floor systems that were never meant for today’s larger tubs and walk-in showers. We rebuild the room as a sealed, vented, water-managed space, then finish it to match the era of the home where that makes sense. For the full Pedley-specific scope: Bathroom Remodeling in Pedley.

Bathroom Remodeling in Pedley
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (866) 808-7312

What happens when you call

  1. 1
    A real person answersNo phone trees — you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Kitchen Remodeling in Pedley

Kitchen remodeling in Pedley is usually a full-gut proposition because the homes are old enough that surface updates stop making sense. The heat and dust in 92509 push hard against original 1960s and 1970s kitchens, and by the time a homeowner calls us, cabinets are delaminating, exhaust fans are recirculating hot air, and the layout was designed for a family that lived here forty years ago. We rebuild Pedley kitchens around the way people use the room now, with materials that hold up to the Jurupa Valley climate. For an overview of how we run kitchen jobs across our service area, see Kitchen Remodeling.

Full Gut and Reconfiguration

Signs you need it

You want more than new cabinet faces, or the existing layout cannot support a modern range, hood, and refrigerator without cramped work zones.

What it costs in Pedley

A full kitchen gut with reconfiguration in Pedley typically runs $45,000 to $85,000 depending on structural changes, cabinet line, and appliance specification.

How we do it

We strip the room to framing, adjust load-bearing walls where county plan check approves, relocate plumbing and electrical, then rebuild with new insulation, drywall, flooring, cabinets, counters, and appliances.

Cabinet, Countertop, and Appliance Upgrade

Signs you need it

Your layout works but the cabinet boxes are sagging, drawer slides are shot, or the cooktop and oven are underperforming against the summer heat load.

What it costs in Pedley

Cabinet and countertop replacement with appliance upgrade in Pedley typically runs $25,000 to $50,000 including mid-grade materials and professional installation.

How we do it

We remove old cabinets and counters, repair or level wall surfaces, install new semi-custom cabinets and stone or solid-surface counters, then set and calibrate the new appliances and hood.

What Kitchen Remodeling Costs in Pedley

Item Typical range in Pedley
Cabinets and countertops $15,000 – $40,000
Appliances and hood $5,000 – $15,000
Full gut kitchen with reconfiguration $45,000 – $85,000

In Pedley specifically, the heat pushes a few line items higher. Strong range hood venting and upgraded insulation cost more up front, but they keep a Jurupa Valley kitchen usable in July and August. Every estimate we write is itemized, and the price we quote is the price we build to unless you change scope after signing.

How long does a full kitchen remodel take in Pedley?

A full kitchen remodel in Pedley typically takes 6 to 10 weeks. Riverside County plan check and inspection scheduling can add a week or two compared with incorporated cities. Call (866) 808-7312 for a timeline specific to your project.

Will my Pedley kitchen remodel need county permits?

Yes, any kitchen remodel that moves plumbing, electrical, or structural walls in unincorporated Pedley needs Riverside County Building & Safety permits. We pull and close all of them on your behalf. Call (866) 808-7312 for a free estimate.

Brands We Service in Pedley

We work with the brands Pedley homeowners are already researching. On kitchen and ADU projects we regularly install and finish systems from Mighty Buildings, Boxabl, and Tuff Shed, plus James Hardie fiber-cement siding on applicable exteriors. See our brands for the full breakdown. Components are ordered to your site with factory lead times confirmed before we start.

Pricing for ADU Company in Pedley, CA

Service Typical range in Pedley
Kitchen remodel, full gut with reconfiguration $45,000 – $85,000
Cabinets and countertops $15,000 – $40,000
Bathroom remodel, full replacement $18,000 – $35,000
Detached ADU, prefab or modular $180,000 – $350,000
Garage conversion ADU $90,000 – $160,000
Primary suite addition $120,000 – $220,000

Two things push prices up in Pedley more than elsewhere. The first is site work on older ranches, where we sometimes find outdated electrical services or slab conditions that need correction before a remodel can pass county inspection. The second is the cooling and insulation load tied directly to Jurupa Valley heat and Santa Ana dust. Whatever the number, we write it down and hold to it.

Neighborhoods We Serve in Pedley

Our Pedley work concentrates in the residential pockets of 92509, from the original ranch neighborhoods along the Jurupa Valley corridor to the newer infill parcels between Rubidoux and Glen Avon. If your property is in the unincorporated county portion of Pedley, we know the Riverside County permitting path already.

  • Old Pedley ranch neighborhoods near Jurupa Valley
  • Residential pockets off Van Buren Boulevard
  • Areas adjacent to the Pedley industrial corridor
  • Infill and acreage parcels in 92509

Response time for a free estimate in Pedley is usually within a few business days depending on our current schedule.

Service Area – Cities Near Pedley

We run jobs in the communities around Pedley, including Glen Avon, CA, Sunnyslope, CA, Rubidoux, CA, and Riverside, CA. Each one has its own jurisdiction and lot patterns, so permit paths vary even between addresses a mile apart.

Serving Pedley, CA — Our Local Coverage Area

We’re based in the Pedley area and know this community well. Use the map below to see our service coverage — if you’re nearby, we can almost certainly help.

FAQs About ADU Company in Pedley

Ready to get started? Free estimates · Free written quotes response in Pedley
Call (866) 808-7312

What happens when you call

  1. 1
    A real person answersNo phone trees — talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you — the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Pedley Customers Say

★★★★★ 4.8 from 4+ reviews

"The kitchenette layout he suggested made better use of the space than the one on our original sketch."

— Lucia Flores

"Detached unit in the back yard. Utilities trenched, separate meter, and it passed final on the first inspection."

— Ernesto Hernandez

"Unit came out great and the tenant is happy. The timeline ran long, largely because of how slow the city was on plan check, though a couple of the delays were scheduling on their end."

— Shane Miller

How It Works in Pedley

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote — no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Pedley — typically within 30–60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Request a Free Estimate

Tell us what's going on in Pedley — we'll get back to you fast. No obligation.

By requesting your free estimate, you agree to our Privacy Policy and authorize us to contact you by call, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch